Week 3 into our renovation works. Everything is moving accordingly to schedule and our contractor is doing a great job.. she goes down everyday to oversee the progress.. So we can focus on our job, no need take leave to go down..
We met the carpenter on Saturday to do all measurements and confirmation of the laminates for the carpentry, which includes : Kitchen Cabinets, Shoe Cabinets, 6xPillars for divider, MBR vanity sink overhang cupboard, dresser, wardrobe and finally the study table. Our wardrobe will be the most expensive stuff in the MBR.. its a 3.6m long wardrobe which cost ~$3400. Cant wait to see it...
The paint is up and all light boxes and false ceiling is also up. Now it looks so much neater, unlike last week when we came, baby got a shock with the dangling cables all over..
Week 4 will be re-laying or MBR parquet flooring and polish to shine and other small tasks to be done. Next Saturday, the electrician will be here to install all lighting and ceiling fans. So after that we can visit the home during night time already.. No more torch lights.. Soon the renovation works will be done, and we are both very excited to see the final look and feel..
No comments:
Post a Comment